Contravening the Renovation Control Rules carries a fine of up to this amount
On conviction, plus other penalties, and the liability attaches to the flat owner as well as to the contractor.
Reported bands run S$25,000 to S$50,000 for a 3-room flat. Every rule below is cited to HDB with the date it was read, and every figure names its publisher.
HDB renovation is reported at S$25,000 to S$50,000 for a 3-room flat and S$51,000 to S$61,800 for a 4-room. Only a firm in the Directory of Renovation Contractors may do the work, hacking needs written approval first, and approved works must finish within 3 months in a new block.
01 PERMIT
Hacking always
needs one
All demolition and hacking of walls, partial or complete, needs HDB’s prior written approval before anything starts.
hdb.gov.sg · read 2026-08-31
02 HOURS
Mon to Fri
9am to 5pm
Restricted works only. General works such as painting and screed run Monday to Saturday until 6pm.
hdb.gov.sg · read 2026-08-31
03 DEADLINE
3 months for
a new block
From the date the permit is granted. Existing blocks get 1 month.
hdb.gov.sg · read 2026-08-31
Eight work packages: hacking where it is permitted, floor and wall finishes, kitchen, bathroom, carpentry, electrical, plumbing and painting. Naming them is the only way two quotes ever become comparable.
Three things bound the job from outside. A register that decides who may do it, a permit that decides when it must finish, and a working-hours rule that decides which days the noisy parts can happen at all.
Published bands from named third parties, each carrying its publication date. They are ranges, not quotes, and where two publishers disagree both appear rather than an average neither stands behind.
| Item | Reported range |
|---|---|
| 3-room BTO | S$25k to 50k |
| 4-room BTO | S$51k to 62k |
| 5-room BTO | S$40k to 115k |
Ranges as published by each source, not averaged together. Qanvast and MoneySmart figures carry their own publication dates.
Sources interiordiary.com.sg 2026-08-31qanvast.com 2026-08-31moneysmart.sg 2026-08-31
A resale flat costs more than the same flat as a BTO flat because it has to be stripped before it can be built. Reinstating somebody else’s finishes is real, priced work.
Only a firm listed in the Housing & Development Board’s Directory of Renovation Contractors may carry out the work, under the Housing and Development (Renovation Control) Rules 2006. The requirement covers works that need no separate approval.
On conviction, plus other penalties, and the liability attaches to the flat owner as well as to the contractor.
That owner-liability clause is the one people miss, and it is why the check in the next section is worth the minute it costs you.
Two classes of work with two different windows, which is the part almost every other page gets wrong. General renovation works run Monday to Saturday, 9am to 6pm, and never on Sundays or public holidays.
Sources MyNiceHome by HDB 2026-08-31
Restricted renovation works, meaning demolition, removing wall or floor finishes and cutting tiles, run Monday to Friday, 9am to 5pm only. They are additionally banned on the eves of New Year’s Day, Chinese New Year, Deepavali, Hari Raya Puasa and Christmas Day.
Search the firm’s legal name in the Directory of Renovation Contractors e-Service. It is public, free and settles the question before any deposit moves.
No firm is HDB approved. The register answers one question: may this firm lawfully work in an HDB flat.
Match the entity on the register to the entity on the contract and on the invoice. A brand name on a shopfront is not necessarily the company that will be taking your deposit, and the register indexes the company.
The HDB renovation permit is filed by your contractor before anything starts. Approved works must finish within three months in a newly completed block and one month in an existing one.
Sources HDB 2026-08-31HDB building works 2026-08-31
The window is counted from the date the permit is granted rather than the date anyone turns up. A programme that plans to use every available day has no room left for the conditions found once a wall is open.
A new flat starts from a finished shell. A resale flat carries stripping out and reinstatement before any of the work you actually want can begin, and it carries a shorter permit window too.
The gap narrows the moment you opt out of the Optional Component Scheme, because then the new flat also has a floor to remove and make good. That is the next section, and it is the line most comparisons leave out.
The scheme supplies flooring and sanitary fittings pre-installed, at a price folded into the flat price. The component list and the price are set per BTO launch rather than fixed across the scheme.
Any figure you read for OCS belongs to that project and that year. Opt in for a known price, opt out and you pay to remove before you pay to replace.
The decision is made at flat selection, long before you appoint anyone. It is worth taking seriously at that point rather than treating it as paperwork, because undoing it later is the expensive direction.
Two documented projects report that same shape, and neither figure is a quote for your flat. They are there so you can recognise the line when it is missing from a quote.
If a quote prices your new floor but says nothing about removing the old one, it is not cheaper than the quote that does. It is less complete.
What changes between flat types is run length, not the work packages. The 4-room carries the longest carpentry run of the common types and the widest published spread.
We walk the flat after key collection, measure every run, and write down what you want changed and what HDB will let you change.
Your contractor files the electronic application. Wall demolition needs the flat’s floor plan submitted with it.
Demolition, tiling and anything touching the bathroom happen first, inside the restricted-hours window.
Kitchen and wardrobe carpentry is fabricated to a fixed specification, then installed, then painted.
Ask for the quote to follow these headings package by package. Once two firms present the same structure the conversation stops being about totals and starts being about scope, which is the only comparison that means anything.
Tell us the flat type and when you collect keys. You get a scope discussion and an indicative cost band within one working day.
or email hello@btorenovation.sg
Each stage blocks the next. Two are routinely run out of order, and both cost money to undo.
Read a programme against this order. Carpentry scheduled before the site measure, or painting before the defects walk, means the programme was written to look short rather than to be delivered.
The permit window is the outside date, not the estimate. Three months in a new block is what the law allows, and a schedule built to use all of it is a schedule with no contingency.
Ask for lead time and install time as two separate numbers. Carpentry is fabricated off site, so the weeks before anything appears in the flat are real weeks.
Structural walls, beams and columns are never removable, whatever a mood board shows. Non-structural walls can go, with written approval obtained first.
A firm that cannot tell you which category a wall falls into before quoting has answered a different question about itself.
The classification is knowable from the floor plan before anyone quotes. Get it settled in writing at that stage, because a wall that turns out to be structural after the deposit is paid becomes a design change you did not budget for.
Waterproofing sits under the screed. Breaking the membrane changes the basis of a bathroom job rather than adding a line to it, and the unit below is the one that finds out.
The room you most want to change has the least freedom in the first years. Plan around it rather than discovering it after the tiles are chosen.
Waterproofing is also where a cheap job hides longest. A membrane that was rushed will not show up on handover day, it will show up on somebody else’s ceiling a year later.
Priced per foot run, so run length drives the number more than the rate does. Two quotes at the same rate can differ by thousands because one measured more.
The variable nobody shows you is the carcass behind the laminate. Ask what it is and get the answer in writing, because the cheaper rate on a worse carcass is the more expensive decision by year three.
These two rooms hold the irreversible decisions and most of the wet works. Moving a plumbing point costs more than the cabinet above it, because it means opening the floor and re-waterproofing.
Decide the layout before anything is ordered. A sink moved after first fix is not a change of mind, it is a variation order with a rate attached.
Electrical work must be done by a worker holding the relevant Energy Market Authority licence, which is separate from the firm’s own registration. Ask which named worker holds it.
The licence sits with the worker, not with the firm's registration in the Directory of Renovation Contractors.
Four things, and a quote missing any of them is describing a different job from the one next to it.
An interior design firm and a direct contractor both have to produce this. The route changes who coordinates the trades, not what the document has to contain.
Tie payments to stages you can walk into and inspect, never to dates in a calendar.
Write the split into the contract rather than agreeing it on a call. A firm that wants most of the money before the wet works are finished is telling you something about its cash position, and you would be the one funding it.
Tell us the flat type and when you collect keys. You get a scope discussion and an indicative cost band within one working day.
or email hello@btorenovation.sg
A renovation loan funds the contract, and the shape of the spend is the thing to notice: it lands inside a short permit window rather than across a year.
This page names no bank and recommends no lender. Size the borrowing against an itemised quote and a named contingency instead of a headline package figure.
Neighbours within a radius of two units must get written notice at least five days before works begin, and the Notice of Renovation stays displayed outside the flat throughout.
If works next door fall outside the permitted hours, the notice is where you check what was approved. A complaint about lawful daytime work will go nowhere, and it should.
Ordering carpentry before the site measure. Treating the permit window as somebody else’s problem. Paying the final balance before the defects list is closed.
All three are decisions taken early and discovered late, which is why this hub puts the rules and the sequence in front of the design ideas rather than behind them.
Regulatory claims cite HDB directly with the date the page was read. MyNiceHome, HDB’s own homeowner guide, carries the same rules in a friendlier form and is worth reading beside this page.
Cost figures name their publisher and publication date, Qanvast and the others alike. Where two disagree, both appear, because an average of two dated ranges is a number nobody published.
No licence number, no accreditation, no review, no star rating and no photograph captioned as our own completed project. None of those exist for BTO Renovation SG, so none appears here.
Every interior image on this site is a generated illustration and says so. These are the checks we are telling you to run on any contractor, including us.
Tell us which project, which flat type and when you collect keys, ideally before key collection rather than after. You get a reply within one working day with a scope discussion and an indicative cost band.
Checked against primary sources · updated 2026-09-01