Demolition and hacking need written approval before work starts
The hdb renovation guidelines apply identically whatever the flat size. Get every wall classified from the plan before anyone quotes.
A 5 room BTO renovation is reported from around S$40,000 for a new flat, against S$78,600 to S$93,500 for a resale 5-room. Two different cases, kept apart here.
A 5 room BTO renovation is reported from around S$40,000 for a new flat. Resale 5-room renovations are reported at S$78,600 to S$93,500, which is a different case entirely. The 5-room BTO flat is around 110 square metres and carries the longest carpentry runs of any type.
01 PERMIT
Hacking always
needs one
All demolition and hacking of walls, partial or complete, needs HDB’s prior written approval before anything starts.
hdb.gov.sg · read 2026-08-31
02 HOURS
Mon to Fri
9am to 5pm
Restricted works only. General works such as painting and screed run Monday to Saturday until 6pm.
hdb.gov.sg · read 2026-08-31
03 DEADLINE
3 months for
a new block
From the date the permit is granted. Existing blocks get 1 month.
hdb.gov.sg · read 2026-08-31
Around 110 square metres, three bedrooms, a larger living area and, in many layouts, a long internal corridor. The same eight work packages, at the largest quantities of any flat type.
The corridor is what makes this flat different. It is floor area you have paid for that contributes nothing until a carpentry plan puts it to work.
Reported new-flat fit-outs start from around S$40,000. The number most often quoted alongside it, S$78,600 to S$93,500, describes resale flats.
| Item | Reported range |
|---|---|
| 3-room BTO | S$25k to 50k |
| 4-room BTO | S$51k to 62k |
| 5-room BTO | S$40k to 115k |
Ranges as published by each source, not averaged together. The resale 5-room figure is shown separately because it is a different job.
Sources interiordiary.com.sg 2026-08-31qanvast.com 2026-08-31moneysmart.sg 2026-08-31
Conflating those two is the most common error in 5-room budgeting. A resale flat carries stripping out and reinstatement that a new flat does not.
Check which case a figure describes before you use it. A number lifted from a resale article will make a new-flat budget look comfortable right up until the quotes arrive.
Corridor length is the first decision. Left alone it is circulation. Lined with full-height storage it becomes the most useful square metres in the flat.
We walk the flat after key collection, measure every run, and write down what you want changed and what HDB will let you change.
Your contractor files the electronic application. Wall demolition needs the flat’s floor plan submitted with it.
Demolition, tiling and anything touching the bathroom happen first, inside the restricted-hours window.
Kitchen and wardrobe carpentry is fabricated to a fixed specification, then installed, then painted.
The second is whether the extra living area justifies a separate utility zone rather than more sofa. In a flat this size that is a genuine choice rather than a compromise.
Both decisions are cheaper to make on paper than in carpentry. Walk the flat with the plan once before anything is measured, and mark what each wall is actually for.
Start from scope rather than from a headline figure. The published bands describe other people’s flats and other people’s decisions about that corridor.
Those three answers move a 5-room budget more than any choice of laminate ever will. Make them before you collect quotes, not after.
Then price the scope rather than the flat. A number attached to a described scope survives contact with a contractor; a number attached to a flat type does not.
Structural walls, beams and columns are never removable. In a larger flat there are simply more walls to classify, and more chances to assume wrongly.
The hdb renovation guidelines apply identically whatever the flat size. Get every wall classified from the plan before anyone quotes.
Only a firm in the Housing & Development Board’s Directory of Renovation Contractors, under the Housing and Development (Renovation Control) Rules 2006.
The same register covers every renovation contractor Singapore homeowners can lawfully engage, and the penalty attaches to the flat owner too.
The HDB renovation permit is filed by your contractor before anything starts, and the window runs from the day it is granted.
General renovation works run Monday to Saturday, 9am to 6pm. Restricted renovation works, meaning demolition, removing finishes and cutting tiles, run Monday to Friday, 9am to 5pm only.
Sources MyNiceHome by HDB 2026-08-31
They are also banned on five named festival eves. With the longest hacking list of any flat type, a 5-room programme loses more to that rule than a smaller one does.
If you kept the Optional Component Scheme flooring, a quote should not price new floors. If you opted out, removal and making good belong in it as named lines.
Over 110 square metres the removal and making-good cost is the largest of any flat type, which makes opting out the most expensive decision here.
Tell us the flat type and when you collect keys. You get a scope discussion and an indicative cost band within one working day.
or email hello@btorenovation.sg
A resale flat renovation carries this cost by definition. A new 5-room flat only carries it if you chose to, which makes it the clearest example of a decision people make without pricing.
Priced per foot run, and this flat has the longest runs on any site. Corridor storage alone can rival a whole bedroom’s worth of carpentry.
Carpentry Singapore-wide is quoted this way, so the comparison travels. In a 5-room flat the difference between two measures is the largest single variable in the whole quote.
Ask for the corridor run to be listed on its own line. It is the run most often bundled into a total, and the one most worth seeing separately.
Once it is on its own line you can price it as a choice rather than inherit it as an assumption. That is the whole argument for itemised quotes in one sentence.
The longest run of any flat type, which makes an island or a peninsula a real option rather than a fantasy. It also makes the plumbing decision more expensive to change.
A kitchen renovation in Singapore is priced on run length and wet works. Here both are at their maximum, so settle the layout before anything is ordered.
An island is the decision that most often gets added late and costs most to add. It needs floor space, a plumbing decision and usually a power point, all before first fix.
Two bathrooms in most 5-room layouts, and the master is usually the larger of any flat type.
A toilet renovation in Singapore is a waterproofing decision wearing tiles. Two rooms means two membranes, two sets of falls and two chances to get it wrong.
Electrical work must be done by a worker holding the relevant Energy Market Authority licence, separate from the firm’s own registration.
This flat carries the highest point count of any type. Walk the plan room by room and agree every socket before first fix.
Overlay is faster and avoids making good, at the cost of raising the floor level. Over 110 square metres the saving is the largest available anywhere in this decision.
This is the flat type where the two options diverge most in both money and weeks. Price both rather than assuming the more thorough one is obviously correct.
If you kept the Optional Component Scheme flooring and like it, overlay is often the whole answer. The floor you already own is the cheapest floor available to you.
Coverage and preparation, not the brand on the tin. With the most wall area of any flat type, an extra coat here is a substantial line rather than a rounding error.
Ask how many coats and what surface preparation is included. Those two answers explain most of the spread between painting lines that otherwise look identical.
Each stage blocks the next, and this flat has the most of every stage to work through inside an identical permit window.
Build the renovation timeline backwards from the permit expiry rather than forwards from the start date. In a 5-room flat that is the only version of the schedule that survives contact with the site.
Occupancy is set by HDB policy rather than by us, and it is worth checking directly. What matters here is the renovation consequence of the answer.
Household size is what decides how many bedrooms stay bedrooms, and that decision is what the carpentry is measured against. Make it before the measure, not after.
It is also the decision most likely to change within five years. Built-in storage that can be emptied beats built-in furniture that can only be removed.
Tell us the flat type and when you collect keys. You get a scope discussion and an indicative cost band within one working day.
or email hello@btorenovation.sg
Four things, and in the flat with the most carpentry the third one carries most of the weight.
A quote produced without a site measure is a guess. Over 110 square metres, a guess is the most expensive document in the process.
Because no two firms scope the same job from the same brief. One lines the corridor, another leaves it as circulation.
That single difference can account for most of the gap between two quotes. It is worth remembering when an hdb renovation loan is sized against the higher one.
Tie payments to stages you can walk into and inspect, never to dates.
In the largest flat the sums are largest too, which makes the final balance the most valuable piece of leverage you will hold at any point in the project.
Treating the corridor as circulation until the carpentry is already built. Budgeting from a resale 5-room figure. Ordering before the site measure.
The last one is browsing reference images for months and never turning any of them into a measured, written scope. Only the scope can be priced, and only a price can be compared.
Every number carries a named publisher and its publication date. Regulatory claims cite HDB directly with the date the page was read.
Where two publishers disagree, both figures appear. The guide to renovating an HDB flat applies the same method across the site.
No licence number, no accreditation, no review, no rating and no photograph captioned as our own completed project. None exists for BTO Renovation SG.
Every interior image here is a generated illustration and says so. The 3 room BTO renovation page holds itself to exactly the same standard.
Tell us the BTO project, that it is a 5-room, when you collect keys and what you decided about the Optional Component Scheme.
You get a reply within one working day with a scope discussion and an indicative cost band. Tell us about the corridor too, because it is the line that moves a 5-room number most.
Checked against primary sources · updated 2026-09-01