HDB registers renovation contractors. It does not endorse or rank them
Registration tells you a firm was permitted to be there. It gives you no route to HDB if the workmanship disappoints you.
Contravening the Renovation Control Rules carries a fine of up to S$5,000 on conviction, and the liability attaches to the flat owner as well as to the firm.
An HDB renovation contractor is a firm listed in HDB’s Directory of Renovation Contractors. HDB registers those firms; it does not approve, endorse or rank them, so no firm is HDB approved. Contravening the rules carries a fine of up to S$5,000 on conviction, and it binds the flat owner too.
01 PERMIT
Hacking always
needs one
All demolition and hacking of walls, partial or complete, needs HDB’s prior written approval before anything starts.
hdb.gov.sg · read 2026-08-31
02 HOURS
Mon to Fri
9am to 5pm
Restricted works only. General works such as painting and screed run Monday to Saturday until 6pm.
hdb.gov.sg · read 2026-08-31
03 DEADLINE
3 months for
a new block
From the date the permit is granted. Existing blocks get 1 month.
hdb.gov.sg · read 2026-08-31
A firm permitted to carry out renovation works inside an HDB flat, because it appears in one public register maintained by the Housing & Development Board.
That is the whole of what the status means. Everything else a firm tells you about itself is marketing, and some of it may still be true. Who may work is the first of the five rules that bind every job.
The authoritative answer is the register itself, and the honest answer is that no firm holds an approval. HDB registers; it does not approve.
Do the search yourself rather than accepting a screenshot. A screenshot proves somebody was listed on some day, and the register is the thing that is true right now.
Any site describing itself as approved is claiming a status the register does not issue. That is worth noticing about the site as well as about the firm.
This page names none. Every ranked list you will find is ordered by advertising spend, affiliate commission or editorial relationship.
Those three separate firms in a way a list cannot, and all three are things you can verify in an afternoon without trusting anybody.
Rankings also age badly. A firm that was excellent two years ago may have lost the people who made it so, and a list has no way of telling you that.
Published bands by flat type, each with its publisher and publication date. They are reported ranges rather than quotes.
| Item | Reported range |
|---|---|
| 3-room BTO | S$25k to 50k |
| 4-room BTO | S$51k to 62k |
| 5-room BTO | S$40k to 115k |
Ranges as published by each source, not averaged together. Use them to sanity-check a quote, not to price a flat.
Sources interiordiary.com.sg 2026-08-31qanvast.com 2026-08-31moneysmart.sg 2026-08-31
A firm quoting far below these bands is not necessarily cheaper. It is more often quoting a different scope, which is why the itemisation matters more than the total.
Ask too whether the quote assumes you kept the Optional Component Scheme flooring. That single assumption moves the flooring line and the hacking line at the same time.
Air-conditioning installation is a different trade with its own requirements, and it is not what the renovation register covers.
Ask who is doing it, under what competence, and whether it sits inside your renovation contract or beside it. Work that falls between two contracts is work nobody has warranted.
The same question applies to any specialist trade brought in late. Get it named in the contract or get it excluded from it, and know which before the work starts.
One thing: that the firm may lawfully carry out renovation works in an HDB flat. It is not a quality mark, a workmanship guarantee or evidence that HDB has inspected anything.
Registration tells you a firm was permitted to be there. It gives you no route to HDB if the workmanship disappoints you.
A fine of up to S$5,000 on conviction plus other penalties. The part most people miss is who it attaches to.
Contravening the Housing and Development (Renovation Control) Rules 2006 is an exposure you carry personally, which is why the one-minute check is worth doing.
They get used interchangeably in marketing and they mean entirely different things. Only one of them governs work inside your flat.
A firm holding the second and third but not the first still may not renovate your flat. A firm holding only the first lawfully may.
The HDB renovation permit, filed by the firm rather than by you, before anything begins.
Ask to see it once granted and check the dates against the programme you were given. A programme that runs past the window is not yet a programme.
Tell us the flat type and when you collect keys. You get a scope discussion and an indicative cost band within one working day.
or email hello@btorenovation.sg
General renovation works run Monday to Saturday, 9am to 6pm. Restricted renovation works, meaning demolition, removing finishes and cutting tiles, run Monday to Friday, 9am to 5pm only.
Sources MyNiceHome by HDB 2026-08-31
They are additionally banned on five named festival eves. A firm that plans the noisy work without that constraint has already lost days it will try to recover later.
Remove a structural wall, beam or column. There is no approval route and no engineer’s letter that changes it.
Demolition of a permitted non-structural wall still needs written approval obtained before work begins, not applied for afterwards.
Three different jobs that get described with the same words. What separates them is who carries responsibility when something goes wrong.
Whichever route you take, the firm touching your flat must be on the HDB register. The route changes the coordination, not the rule.
Coordination is a real service and it has a real price. What it does not do is change who is permitted to work in the flat or what the quote has to contain.
A renovation quotation missing any of these cannot be compared to the one beside it.
Ask for it before you shortlist. A firm that will not itemise at quotation stage will not itemise at variation stage either.
Itemisation is also how you find out whether a firm has actually looked at your flat. Generic line items in the same order on every quote are a template, not a measure.
Because no two firms scope the same job from the same brief. One assumes the flooring stays, another prices removing it.
Normalise the scope and the numbers converge. Most of what looks like a price difference is a scope difference nobody wrote down.
It also matters when a renovation loan is sized against the higher of two quotes. You may be borrowing against an assumption you never agreed to.
Tie payments to stages you can walk into and inspect, never to dates in a calendar.
Write the staging into the contract rather than agreeing it verbally. A firm wanting most of the money before the wet works are done is describing its own cash position.
That single discipline prevents most payment disputes, because it removes the argument about whether a stage was actually reached.
Four clauses decide most disputes, and none of them is the price.
Read those four before you read the total. They are the clauses that decide what the total actually turns out to be.
None of them is unusual to ask for. A firm that treats them as an imposition is telling you how the rest of the project is likely to go.
Do not proceed. The requirement covers works that need no separate HDB approval, so there is no category of job small enough to be an exception.
If a firm tells you the rule does not apply to their kind of work, that is itself the answer to your question about the firm.
Tell us the flat type and when you collect keys. You get a scope discussion and an indicative cost band within one working day.
or email hello@btorenovation.sg
Electrical work must be done by a worker holding the relevant Energy Market Authority licence, which is separate from the firm’s own registration.
The licence sits with the worker rather than the firm. Ask which named person holds it and confirm they are the one doing the work.
A programme is a claim about competence. Read it against the order the trades actually have to run in.
Ask for the programme in writing at quotation stage. It costs a firm nothing to produce if they have genuinely planned the job, and a great deal of improvisation if they have not.
Carpentry scheduled before the site measure, or painting before the defects walk, means the programme was written to look short rather than to be delivered.
Ask which stage the firm considers the critical path. A contractor who cannot answer that has not planned your job, they have described a general order of work.
A defects liability period runs from handover and is not the same as a workmanship warranty. Get both in writing.
Re-plastering and re-finishing a cut surface takes materials and labour. If it is not a named line in the quote, it was not priced.
Regulatory claims cite HDB directly with the date the page was read. Cost figures name their publisher and publication date.
We walk the flat after key collection, measure every run, and write down what you want changed and what HDB will let you change.
Your contractor files the electronic application. Wall demolition needs the flat’s floor plan submitted with it.
Demolition, tiling and anything touching the bathroom happen first, inside the restricted-hours window.
Kitchen and wardrobe carpentry is fabricated to a fixed specification, then installed, then painted.
A figure we cannot source is left off the page rather than estimated, which is why some questions here are answered with a range and others are not answered at all. The register is the one claim on this page that you can check for yourself in under a minute.
Where two publishers disagree, both figures appear. The renovation contractor guide applies the same method to hiring across the whole flat.
None exist for BTO Renovation SG, so none appear. A fabricated review would also be a false representation under the Consumer Protection (Fair Trading) Act.
Every image here is a generated illustration and says so. Run the register check on us as readily as on anyone else, and read how carpentry is specified before you compare quotes.
Tell us which BTO project, which flat type and when you collect keys. You get a reply within one working day with a scope discussion and an indicative cost band.
You are welcome to check us against the register before you send anything. That is the order we would recommend to anybody, including about ourselves.
Checked against primary sources · updated 2026-09-01